Pay for a house in Nigeria stage by stage, foundation, damp-proof course, lintel, roofing and finishing, and release each payment only after the stage is checked by someone independent of the builder. Get the permit first: in Lagos, planning permits have been processed only online through LASPPPA's e-platform since 1 April 2026, and LASBCA certifies construction stages.
Building a house in your hometown is one of the most common goals of Nigerians abroad, and one of the most common sources of loss. The pattern is familiar: money goes to a relative or contractor in large sums, progress photos slow down, and a visit home reveals a structure far behind what was paid for. Staged payments, independent checks and a paper trail do most of the work of preventing that.
Before the first payment: title and permit
Do not pay for construction on land whose title you have not checked. Our guide on checking a C of O from Ireland covers the land side. Then the building permit. Rules are set by each state:
- Lagos: the Lagos State Physical Planning Permit Authority (LASPPPA) moved planning permits fully online from 1 April 2026, with applications only through its e-platform and manual processing ended, according to a July 2026 Nairametrics report. Applications can be made from abroad.
- Stage certification in Lagos: the Lagos State Building Control Agency (LASBCA) issues the authorisation to commence and certifies stages. In July 2024, after a building collapse, Lagos revoked all commencement certifications and told owners to revalidate them at LASBCA, and said occupying a building without LASBCA certification is a criminal offence (Peoples Gazette, 27 July 2024).
- Other states: each has its own planning authority and fees. Ask your architect which approvals apply where you are building, and get copies.
Set the stages and the price of each
Ask your architect or a quantity surveyor for a bill of quantities, then turn it into a schedule of stages. A property guide published by Ownkey in July 2026 lists the stages Lagos certifies as foundation, damp-proof course (DPC), lintel and roofing, followed by a certificate of completion and fitness for habitation. Those are natural payment points.
| Stage | What should be visible | Example share of budget |
|---|---|---|
| Setting out and foundation | Trenches, blinding, foundation blocks | 15% |
| Up to DPC | Oversite concrete, DPC level reached all round | 10% |
| Walls to lintel | Block walls, door and window openings, lintel cast | 20% |
| Roofing | Roof structure and covering complete | 20% |
| Services and plastering | Electrical and plumbing first fix, plaster | 20% |
| Finishing | Floors, doors, windows, paint, fittings | 15% |
The percentages are an example only; they add up to 100% and should be replaced with your own bill of quantities.
Worked example
Take an example budget of ₦45,000,000. At the shares above, the foundation stage is ₦6,750,000, DPC ₦4,500,000, walls to lintel ₦9,000,000, roofing ₦9,000,000, services and plaster ₦9,000,000 and finishing ₦6,750,000. Those six figures sum to ₦45,000,000. Hold back a retention, say 5% of each stage, until the stage is signed off, and keep a contingency outside the budget for price rises, because building material prices in naira can move sharply within a single build.
Verify before you release money
- Use a supervisor who does not work for the builder: an engineer, architect or quantity surveyor you appoint and pay. You can check a Nigerian engineer's or firm's registration number on the COREN verification portal.
- Ask for dated photos and a walk-round video at each stage, from the same angles each time, with a newspaper or a phone showing the date in shot.
- Get a short written stage report from your supervisor before each release.
- Where possible, pay suppliers (blocks, cement, roofing sheets) directly against their invoices rather than giving the contractor the cash to buy.
- If you hold a power of attorney arrangement for someone to act for you, read signing a Nigerian power of attorney in Ireland first.
When a relative is managing the build
Many builds from abroad are run by a brother, an uncle or a family friend, and that can work well. It works best when the relative's role is written down like any other job: what they decide alone, what needs your approval, and whether they are paid for their time. A relative who is paid a fair supervision fee has less reason to take a margin on materials. Agree a spending limit above which they must ask you first, and ask for the same photos, receipts and stage reports you would ask of a contractor. Clear rules are not a sign of distrust; they are what lets a family stay on good terms after the house is finished.
Visit, or send someone independent, at least at the foundation and roofing stages. Those are the points where hidden shortcuts (shallow footings, too little reinforcement, weak roof timber) are hardest to fix later.
Records that protect you
Keep a single ledger: date, stage, amount, who was paid, what for, and the evidence. File the contract, drawings, permit, stage reports, receipts and photos together. If the build stalls or a relative later disputes what was spent, this file is what settles it. For the wider money side of building from abroad, see building a house in Nigeria from abroad.
Where Pryme fits
A Pryme Personal Account opened from Ireland holds euro and naira, so you can convert in tranches with Swap and send naira to each supplier or contractor when a stage is signed off; the app shows the rate and the fee before you approve. Your Personal Assistant can keep reminders for each stage and prepare payments, but nothing moves without your approval. Verifiable receipts through VerifyDoc.ai give you records anyone can check are unaltered (receipts).
Questions people ask
How do I pay for building a house in Nigeria from abroad safely?
Pay by stage against a written schedule, have each stage checked by a supervisor you appoint, pay suppliers directly where you can, and keep every receipt and photo.
Can I apply for a Lagos building permit from Ireland?
Lagos reported in July 2026 that planning permits have been fully online through LASPPPA's e-platform since 1 April 2026 and can be obtained from anywhere. Your architect usually prepares the drawings and submission.
What are the stages of building a house in Nigeria?
Commonly foundation, damp-proof course, walls to lintel, roofing, services and plastering, then finishing. Lagos certifies foundation, DPC, lintel and roofing stages through LASBCA.
How do I check my engineer is registered?
Use the COREN verification portal with the practitioner's or firm's registration number exactly as it appears on the certificate.
Sources
- Nairametrics: Lagos says building approvals can now be obtained online from anywhere (22 Jul 2026) · accessed Oct 2026
- Peoples Gazette: Lagos revokes all building permits, owners directed to reapply (27 Jul 2024) · accessed Oct 2026
- Ownkey: Nigeria building permits guide 2026 (21 Jul 2026) · accessed Oct 2026
- COREN verification portal · accessed Oct 2026
This article is general information, not financial, legal or tax advice. Products described are provided under the terms on this site and are subject to regulation and eligibility.